Starting the year 2000, IECCA starts its
construction activities, participating in several
construction projects, among which we can mention the
followings: |
 |
|
PROJECT DATA |
DESCRIPTION |
|
Ecologic Avenue Construction |
CLIENT:
AYUNTAMIENTO SANTO DOMINGO ESTE (ASDE)
DATE:
Junio 2008- marzo de 2010 |
Construction of
boardwalks on the north and south side. Construction
of a leisure park with social areas, children
playground, parking lots, ilumination and gardening.
Also a Gazebo and Water system where constructed. |
|

Pedro Domínguez
Garabito
School |
|
School
Construction |
CLIENT:
SECRETARÍA DE ESTADO DE EDUCACIÓN
DATE:
2004-2008 |
Construction of the
Pedro Domínguez Garabito School in Cambita
Garabito. The Esperanza Milena School was
rehabilitated and expanded inLa Canela, Santiago.
The Manuel A.
Machado School in Dajabón was rehabilitated and
expanded. The
Anacaona Almonte School in Santiago was repaired and
expanded. The Ansonia School in La Plena, Azua
and the
San José School in Vicente Noble were repaired as
well.
The María
Nicolasa Billini School in Los Llanos, San Pedro de
Macorís was reconstructed and expanded. All of this
constructions where constructed by the SEE
termination statndars.} |
|
 |
Extensión of the National
Judiciary School |
|
CLIENT:
Escuela Nacional de la
Judicatura (National Judiciary
School)
DATE:
Abril/05-Noviembre/06 |
Construction of four (4) new
classrooms, in steel structure,
and rehabilitation of three (3)
existent ones. Construction of
rest rooms and other external
facilities to connect the
classrooms |
| |
Reinforcing and restructuring of
the Duarte Bridge in Santo
Domingo. |

Duarte Bridge |
CLIENT:
Secretaría de Estado
de Obras Públicas
DATE:
2005-2006
Asociada:
Estrumet Metalmecánica
|
Project that includes the
reinforcement of this 50 year
old steel structure,
reconstruction of the suspended
cable system, application of a
modern corrosion protection
system, new lighting, side
protection, repaving of the deck
and pluvial drainage. |
| |
Civil Work for the 69/12.5 KV
Substation in Rafey |

Substation 69/12.5Kv |
CLIENT:
ABB AS, Power Technologies
Division.
DATE:
2005-2006 |
Civil works construction of the
69/1.5KV electrical substation
located within the waste water
treatment plant in Rafey. |
|
|
Civil Works for the Extension
and Rehabilitation of the
Potable and Waste Water
Treatment Plants of Coraasan, in
Santiago de los Caballeros |
|
Secondary Water Tratment
Planta Rafey

Water Treatment Plant de La Noriega.
|
CLIENT:
Per Aarsleff A/S
DATE:
2004-2006 |
Civil Works for the construction
of the extension in 1m3/sec of
the Noriega potable water
treatment, extension and
rehabilitation of the waste
water treatment plants of Rafey
in 1m3/sec, Cienfuegos of 250
lps and Tamboril of 350 lps,
construction of 6 new pump
stations, within the contract
signed between Denmark’s Per
Aarsleff and la Corporación de
Acueducto y Alcantarillado de
Santiago |
| |
Rehabilitation of the aqueducts
affected by Hurricane George’s
(Villarpando) in the province of
San Juan de la Maguana |
|
|
CLIENT:
Instituto Nacional de Aguas Potables y Alcantarillados (INAPA)
DATE:
2000-2003 |
Construction of a 22 lps slow
filtration water treatment
plant, a 400 m3 reinforced
concrete regulating reservoir,
river bed intake, pumping house,
8" PVC main line of Villarpando
aqueduct, within the
rehabilitation program within
Lote III of the International
Development Bank (IDB) Loan
1152/OC-DR. |
| |
Rehabilitation of the aqueducts
affected by Hurricane George’s
(Las Lomas) in the province of
Azua |
|
|
CLIENT:
Instituto Nacional de Aguas Potables y Alcantarillados (INAPA)
DATE:
2000-2003 |
Construction of a dike, a river
bed filter and a 12" steel pipe
line in the Las Lomas acueduct,
within the rehabilitation
program (Lote III) of the
International Development Bank
(IDB) Loan 1152/OC-DR. |
| |
Rehabilitation of the aqueducts
affected by Hurricane George’s
(Río Vía) in the province of
Azua |
| |
CLIENT:
Instituto Nacional de Aguas Potables y Alcantarillados (INAPA)
DATE:
2000-2003 |
Reconstruction of a 12" steel
pipe line, rehabilitation of a
dike, sand traps and a fast
filtration water treatment plant
(2 filters and 1 flocculation)
in Río Vía acueduct within the
rehabilitation program (Lote
III) of the International
Development Bank (IDB) Loan
1152/OC-DR. |
| |
Arroyo Blanco - El Guanal
Multipurpose Aqueduct |
| |
CLIENT:
Instituto Nacional de Aguas Potables y Alcantarillados (INAPA)
DATE:
1999-2003 |
Completion of a 11 lps slow
filtration water treatment
plant, main and discharge pipe
lines, intake pumping house,
distribution lines and
reinforced concrete regulating
reservoir. |